These tubes contain one or more lines which send and receive information between the Outer-Core pearls and the orion layer, through the avatar-connector.
The information gets from orion layer for example to the brain through energy<->information converters.
Each tube passes through information from different pearls, there is no overlap of pearls between the tubes.
Here is a simple sketch of the connections between the Outer-Core pearls, AC, and OL, showing a connecting tube and the lines inside:
The average non-connected human on the planet has only 2 tubes connected: tube 3 and tube 7. These tubes contain the vital connection lines for the human body to function, without any additional skills or cognitive abilities.
In general, most tubes have only one line inside, but tubes 3 and 7 are very special in this regard: tube 3 contains 22,233 lines, while tube 7 contains up to ~13,300 lines (the actual number is species-dependent: the lowest number for PL species is 8,300). In the orion layer, all lines split up into sub-lines. For example, the largest number of sub-lines is 422 million sub-lines for the main 'mind line'.
Most of the Protoi Alliance members will get 8 tubes connected. These will be tubes 1-8.
Officers and Generals will get 10 tubes connected (tubes 1-10).
If you are an Officer or General of the Protoi Alliance, you can now order these tubes to get connected in you, using your Skib, in a step-by-step connecting process.
****** Before any connecting of the tubes, it is important to run the 'SynchronizeAll' Skib macro: ******
http://www.protoi-healing.org/index.php/SkibUserMacros:SynchronizeAll.
After synchronization is complete (requires 5-7 hours), you may proceed with connecting the tubes.
This needs to be done one tube at a time, step-by-step. The order for connecting the tubes is given below.
** About the 3D-status requirement: **
Some Skib commands require '3D-status'. The easiest way to handle this requirement is to simply speak ALL orders as verbal commands.
For the tube-connection process, only step 6 (activating the lines) requires 3D-status. This means that this step must be done verbally, or alternatively with some 'physical confirmation' defined in advance, such as a physical gesture that you don't normally do. But there is no harm in simply doing ALL the steps verbally, this is the easiest way to handle the 3D-status requirement.
*********************************************************************************************************************************************************************************************
Following is the general procedure to connect each individual tube using Skib:
Connecting a single tube using Skib
1. Give permission to connect the tube
2. Order to connect the tube
3. Order to start installing the lines
4. Wait for the install time
5. Give permission to activate the lines
6. Order to activate the lines -- MUST BE GIVEN VERBALLY or with 'physical confirmation'
Note: This is the only step which requires '3D status'. This order must be given verbally, or you can alternatively define a unique gesture that you don't normally do as 'physical confirmation', and make this gesture while thinking the order.
====================================================================================================================================
Steps 7-10 apply only for tubes 1 and 5. For all other tubes you may proceed with connecting the next tube in the list (see below).
7. Give permission for loading the energy storage
8. Order to load the storage
9. Wait for the loading time
Note: You may proceed with connecting other tubes while you wait for this tube to load (see special note below)
10. Special procedures for tube 1 and tube 5, respectively:
10.1. FOR TUBE 1 ONLY:
- Tube 1 contains a unique system that needs to be initialized in 23 incremental steps, with a small wait between each step, and each step requires permission. But you can give a single order for this whole process and give all needed permissions in advance, as follows:
- Order to initialize the system in 23 incremental steps, with a 20 second wait between each step. For this, also give 23 permissions in advance.
- After giving the above order and permissions, wait 8 minutes for it to automatically complete.
10.2. FOR TUBE 5 ONLY:
- Like tube 1, tube 5 contains a unique system with initialization steps. Give a single order as follows:
- Order to initialize the system in 21 incremental steps, with a 20 second wait between each step. For this, also give 21 permissions in advance.
- After giving the above order and permissions, wait 8 minutes for it to automatically complete.
*********************************************************************************************************************************************************************************************
Special note about step 9 for tubes 1 and 5:
- You must wait for the loading time before you can proceed to the next step for that particular tube (1 or 5).
However, after you have ordered to start the loading (step 8), you may proceed with connecting the next tubes in the list, and return to step 10 (for tube 1 or 5) when the loading time is complete.
The tubes shall be connected in this order:
Tube 8
Tube 1 (has a special procedure, see step 10 above)
Tube 2
Tube 9
Tube 10
Tube 5 (has a special procedure, see step 10 above)
Tube 4
Tube 6
Note: Tubes 3 and 7 are already connected and don't require any steps.
After all tubes are connected, and all lines are installed and activated, it is a good idea to again run the SynchronizeAll macro.